9FC Feed milling machine
INSTALLATION AND ADJUSTMENT
1. First step:Unpacking and inspecting parts
2.According to the number, first of all, first put 4 on the square frame, install 1 on top of 4 and screw it, then install 5, screw it and then install 2, continue to install 3 backward, and then press on the engine and 7 the main drive pulley, and finally shore up the belt and the protective shell 6
Note: When installing the generator, pay attention to the distance between the generator drive wheels and the main drive wheels, and adjust to the appropriate position before tightening and fixing the engine frame on the main square frame