INSTALLATION AND ADJUSTMENT
1. Open the wooden box, check the main body of the machine and accessories, and put the corresponding machine accessories into categories
2.To install the lifting loader, install the lifting loader frame and square hopper in the position shown in the diagram, tighten the screws
3.Install the pulverizer square bucket, screw in the screws, and install the motor, as shown in the figure shows the square bucket installation position and motor installation position
INSTALLATION AND ADJUSTMENT
4. Connecting the three parts of the vertical mixer, pulverizer and elevator
5.Final step: install and screw in all motor power positions